Demolition Carlingford Cluster Schools CCE were engaged to carry out bulk and detail excavation, remediation and piling activities to facilitate the construction of six new school buildings. Coonara Avenue Civil Works and Services Cherrie Civil Engineering were engaged by Mirvac Projects to undertake a bulk excavation, foundation concrete construction and land sub-division for the construction of over 200 houses and over 250 apartments. Westmead IMHC Early Works The Cumberland West Mental Health Early Works project (CWMH Early Works) forms part of the Westmead Health and Education Precinct redevelopment. CCE were engaged by Roberts Co to complete the complex task of constructing building foundations, concrete retaining walls, temporary shoring, hydraulic diversions including significant underbore works within a site heavily contaminated with friable asbestos and within a live hospital environment. Nielsen Park Seawall The Nielsen Park Seawall project at Shark Beach, delivered by Cherrie Civil Engineering for the National Parks and Wildlife Service, revitalized one of Sydney Harbour’s most cherished swimming spots. The original 1930s seawall, damaged by storms in 2016, required a comprehensive rebuild involving the reconstruction of the seawall bleachers, promenade and landscaping environment. Baxter Road Hotel – Civil Earthworks and Piling Cherrie Civil Engineering were engaged by Roberts Co to complete the civil earthworks, CFA piling, handling and disposal of contaminated fills, D&C sheet pile shoring, OSD tank installation and FRP of footings. Waverley Bowling Club – Bulk Excavation and Remediation Cherrie Civil Engineering were engaged by Mirvac Constructions to provide a design and construct solution for the remediation, bulk earthworks and foundation construction of the Waverley Bowling Club. The Australian Botanic Gardens – Footpath Works Cherrie Civil Engineering were contracted by the Australian Botanic Gardens Trust to upgrade a series of dilapidated footpaths in and around various endangered and highly sensitive flora and fauna in the Botanic Gardens Mount Annan Grounds. Randwick Campus Redevelopment – Hospital Road Lowering Lowering of Hospital Road to facilitate access to the new Randwick IASB development. The project included a complex sequencing of diverting, replacing and amplifying existing live hospital and public service infrastructure whilst maintaining critical services to a functioning hospital. Nepean Private Hospital – Early Works The Nepean Private Hospital project involves the remediation of an existing parcel of land by creating an onsite containment cell and localised asbestos soil removal. Once remediated, an on-grade carpark was constructed as well as structural piles and detail excavation. Wahroonga Roadworks Intersection widening inclusive of services relocation and installation, construction of footpaths and retaining walls, pavement widening and new pavement construction. Campbelltown Hospital Redevelopment Site remediation, demolition, bulk earthworks, shoring, stormwater construction, structural piling, detailed excavation, FRP core bases, and road pavement construction. Royal North Shore Health Hub Demolition, Shoring, bulk, Structural piling and cores, installation of stormwater OSD for north Shore Health Hub building. Campbelltown Hospital Carpark Site remediation and enabling works, stormwater installation, and construction of 3x carparks. Westmead Hospital Bulk Works Bulk & Detail Excavation, Shoring, Foundations, Services and remediation for the Westmead Hospital Acute Services Building. Marrickville Hospital Redevelopment Site remediation, bulk earthworks for both council community centre and residential redevelopments. Hezlett Road, Kellyville – Subdivision Development of existing residential site for new subdivision.