The second major stage of the Coonara Avenue subdivision, CCE progressed uphill for stage 2 continuing to install services, stormwater, retaining walls and roads in the Housing Central area as shown in the above diagram.

CCE were engaged to carry out bulk and detail excavation, remediation and piling activities to facilitate the construction of six new school buildings.

Cherrie Civil Engineering were engaged by Mirvac Projects to undertake a bulk excavation, foundation concrete construction and land sub-division for the construction of over 200 houses and over 250 apartments.

The Cumberland West Mental Health Early Works project (CWMH Early Works) forms part of the Westmead Health and Education Precinct redevelopment. CCE were engaged by Roberts Co to complete the complex task of constructing building foundations, concrete retaining walls, temporary shoring, hydraulic diversions including significant underbore works within a site heavily contaminated with friable asbestos and within a live hospital environment.

Cherrie Civil Engineering were engaged to complete the bulk excavation and shoring to facilitate construction of the new Sydney Children’s Hospital Stage 1 and Minderoo Children’s Comprehensive Cancer Centre.

Cherrie Civil Engineering were engaged by Gazcorp to undertake Bulk earthworks and civil works for a large scale industrial subdivision ‘Momentum Industrial Estate’ located on Wallgrove Rd in Horsley Park. The works included installation of new sewer up to 17m below ground level, new stormwater and water infrastructure.

Cherrie Civil Engineering have been engaged by Taylor Construction Group at the Proximity Banksmeadow Project for the construction of two warehouse structures.

Cherrie Civil Engineering were engaged by Roberts Co to complete the civil earthworks, CFA piling, handling and disposal of contaminated fills, D&C sheet pile shoring, OSD tank installation and FRP of footings.

Lane Cove West business park involved the bulk excavation of an existing sloping site adjacent the Lane Cove River. The project included bulk excavation, stormwater installation and construction of retaining walls

Cherrie Civil Engineering have been engaged for the third time with CPB contractors at the Nepean Hospital to complete the final stage of civil works at Nepean Public Hospital.

Page 1 of 41 2 3 4